Potential AltaLink Transmission Line

 

AltaLink recently announced that their preferred route for a new 138kV transmission line is from Anthony Henday East to their South Cooking Lake substation along Highway 14.

Some residents are wondering why AltaLink selected this route over a southern route through Leduc County, and worry about the negative impacts on our area. Concerns have been raised about how the lines could affect our health, safety, environment, agriculture, property values, etc.Read more here:http://retasite.wordpress.com/2014/07/22/altalink-selects-route-for-cooking-lake-power-line-with-most-impacts/

http://retasite.wordpress.com/2014/05/03/opposition-grows-to-altalinks-proposed-cooking-lake-overhead-transmission-line/

http://www.altalink.ca/projects/natp/sweatd/sweatd-cookinglake.cfm

http://www.sherwoodparknews.com/2014/07/17/138-kv-line-favours-local-route